Bin Charging System

This project consisted of large bins being brought to a filling station where they were placed on a large scale. The bins were then filled from drums using an EHS Variable Height Drum Tipper. EHS built a custom stainless steel work platform where operators emptied material out of the Drum Tipper though an EHS Ventilation Sleeve into the bin below. The long reach from the operator platform to the center of the bin was addressed with a stainless steel transition chute, allowing the operator to charge material close to the platform while still filling in the center of the bin at the opening.